Cultural Resource Reports

Final Approved Annual Report 2020

 

Mineral Resource Studies

USGS Report 2016
BLM Technical Report 2002
DOI Geological Survey 1977

 

Project Field Studies

2019
Ambler Mining District Industrial Access Project Economic Impact Analysis (July 2019)
2017
Assessment of Potential Changes in Wetland and Riverine Functions for the Proposed Ambler Mining District Industrial Access Project in Gates of the Arctic National Park, Alaska (January 2017)
2016
Evaluating Differences in Household Subsistence Harvest Patterns between the Ambler Project and Non-Project Zones (August 2016)
2015
UAF Final Report (December 2015)
Fisheries Report (November 2015)
Habitat Report (June 2015)
South Fork Koyukuk River Fish Surveys (March 2015)
Sound Analysis (March 2015)
Terrain Report (March 2015)
Economic Impact Analysis (February 2015)
Subsistence Study Upper Kobuk (February 2015)
2014
Visual Analysis (November 2014)
Stream Habitat Surveys of Proposed Bridge Crossings (October 2014)
Wetlands Report (May 2014)
Snow Survey Results for the Central Alaskan Arctic (February 2014)
2013
Hydrologic and Hydraulic Field Reconnaissance Report (November 2013)
Raptor Surveys (October 2013)
2012
Anadromous Fish Surveys (June 2012)
Breakup Report (July 2012)
Subsistence Data Gap Memorandum (May 2012)
Wetlands Report (April 2012)
2011
Field Reconnaissance Memorandum (November 2011)

 

 

DOT&PF Studies

DOT&PF conducted a reconnaissance study on the Ambler Mining District Industrial Access Road from 2009 to 2012. The following reports were published as part of the DOT&PF reconnaissance effort.
Summary Report
Executive Summary

Preliminary Hydrology Reconnaissance Memorandum
Baseline Cost Memorandum
Corridor Development Memorandum
Design Criteria Memorandum
Geotechnical Memorandum
Environmental Overview Memorandum
Conceptual Port Cost Evaluation Report